楼凤阁论坛(品茶)_一品阁品凤楼网站论坛_上海落花流水联盟论坛

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 卢龙县| 炉霍县| 得荣县| 逊克县| 昌宁县| 晋城| 乌鲁木齐县| 镇远县| 万荣县| 嘉禾县| 井陉县| 宜黄县| 阜南县| 叙永县| 北安市| 泸水县| 连南| 长武县| 奎屯市| 西平县| 昭平县| 汉中市| 广安市| 济南市| 海伦市| 吉安市| 保康县| 于都县| 遵义市| 汾阳市| 百色市| 湖南省| 曲周县| 兴仁县| 聂荣县| 四川省| 阿鲁科尔沁旗| 临朐县| 尼勒克县| 温宿县| 桦甸市|