楼凤阁论坛(品茶)_一品阁品凤楼网站论坛_上海落花流水联盟论坛

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 钟山县| 罗山县| 大兴区| 图们市| 克什克腾旗| 高阳县| 三河市| 修武县| 峨眉山市| 西宁市| 望奎县| 广东省| 濉溪县| 哈巴河县| 拉孜县| 湾仔区| 舒兰市| 宝兴县| 定安县| 宜阳县| 凤山市| 新疆| 明溪县| 民勤县| 吐鲁番市| 特克斯县| 中山市| 鄂托克旗| 玛曲县| 仪征市| 沽源县| 晋江市| 呼图壁县| 和林格尔县| 洛浦县| 金门县| 黔西| 桓仁| 定南县| 策勒县| 郯城县|