楼凤阁论坛(品茶)_一品阁品凤楼网站论坛_上海落花流水联盟论坛

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

SD28L multi-functional drilling rig construct in cloverleaf junction in Tai Yuan

2009-05-19

Recently, Our SD28L multi-functional drilling rig well performed in the project of torch bridge and its two side crossroads in Shanghai Xi province. It enjoyed a excellent reputation from construction user and project owner.
This project is a major project of Tai Yuan municipal projects. This bridge is 1490m length, having a eight lane road in bidirectional direction. This project has a huge of foundation jobs, with 830 piles(59 piles: Dia 2m, Dep 75-78m; 44piles: Dia 1.5m, Dep 55-66m; the rest: Dia 1.2m or 1m, Dep 38-50m). This project has complicated conditions, mainly featuring fill stratum, medium density sand layer and Clay layer. Silt concentration is up to 80%, so it is strict with equipment and technology.


 


SD28L is the major powerful product of our company, featuring high power, faster drilling and good stability. It is especially suitable for these projects of big diameter piles and deep foundations. This time, in the project, SD28L has created a record by drilling a φ2m pile with 20 hours and aφ1.5m pile with 6-7 hours. It finished all piles and received praise from the user and owner.
It has laid the stable foundation of expanding markets for our company.
 

主站蜘蛛池模板: 景谷| 班玛县| 大洼县| 龙川县| 新河县| 新津县| 兴宁市| 威远县| 德江县| 海晏县| 马尔康县| 凉山| 江安县| 莆田市| 榆林市| 山阴县| 金山区| 遵义市| 泸西县| 贵州省| 万州区| 达州市| 桐梓县| 班玛县| 云梦县| 德化县| 临猗县| 江孜县| 太康县| 肥西县| 固始县| 格尔木市| 儋州市| 沙田区| 皋兰县| 东港市| 靖宇县| 石嘴山市| 射洪县| 青浦区| 星子县|